Twelve steel panels reclaimed from the original Champlain Bridge come together to form its silhouette. Between disappearance and permanence, the bridge finds a new presence in the landscape.

The original Champlain Bridge, its steel spans stretching across the river
The original Champlain Bridge

Conceived by James Kennedy in 2019, when the dismantling of the original Champlain Bridge was announced, Mémoire grew from a desire to preserve part of Montréal's collective memory through the steel of its former bridge. Building on his International Bridges series, the project brings his ongoing exploration of steel, memory and territory, begun in 2008, into public space.

For nearly sixty years, the steel of the Champlain Bridge was part of Montréal's landscape. With Mémoire, five tonnes of this historic steel find a new purpose in public space.

By preserving the rivets and structural connections and restoring the bridge's original colour, the sculpture brings together industrial heritage, material reuse and sustainable art.

A long green-painted, riveted steel member from the Champlain Bridge resting on gravel

From a specific vantage point, the twelve panels recreate the bridge's silhouette as seen from the shore. As visitors move, the image breaks apart into abstraction, recalling the bridge's own dismantling.

Visitors can walk between the panels and touch the steel of the original Champlain Bridge, creating a direct, physical connection with Montréal's history.

Preliminary rendering of Mémoire: twelve staggered, perforated steel panels by the water, forming the silhouette of the Champlain Bridge
Rendering showing the cutouts in a riveted steel panel, with the water and shoreline beyond
3D-printed scale model of Mémoire: twelve perforated panels displayed on a studio table

Renderings and scale model

We acknowledge the support of the Canada Council for the Arts in the creation of the 3D-printed scale model.

a legacy in steel

media coverage

In 2023, Radio-Canada featured Mémoire in a report broadcast on Le Téléjournal, RDI and online.

That same year, the U.S. magazine Modern Steel Construction and AQPI's newsletter featured the project. In 2024, the artist presented it at Montréal's 24 Hours of Science.

  • Radio-Canada Report on Le Téléjournal, RDI and online · 2023 watch ↗
  • Modern Steel Construction Feature on the artist and project · 2023 read ↗
  • AQPI Québec Association for Industrial Heritage · Summer 2023 read ↗
  • 24 Hours of Science Public presentation of the project, Montréal · May 2024
The artist at the storage yard, standing in front of the original bridge members during a Radio-Canada news report
Report by Émilie Dubreuil Photo: Radio-Canada / Ivanoh Demers
The artist interviewed in his studio for Le Téléjournal
Bridge steel members in the storage yard, as seen in the report

artwork
Sculpture comprising 12 staggered, openwork vertical steel panels
material
Historic structural steel from the main members of the original Champlain Bridge · 5 tonnes
dimensions
Panels: 2,845 × 526 × 116 mm (H × W × thickness) · Footprint: 2,000 × 6,000 mm
technical research
Assessment of reclaimed steel, surface-treatment tests and optimization of the perforations for different viewing angles
design
3D modelling, development of perforation techniques and 3D printing of a scale model
engineering
Structural engineering, connections, anchoring systems and foundations to be adapted to the installation site
origin
Champlain Bridge materials reuse competition organized by The Jacques Cartier and Champlain Bridges Incorporated (JCCBI) · Submitted in 2021, selected in 2023
status
Ready for production · Open to partnerships and potential installation sites
years
2019–present
artist and design
James Kennedy
support
Canada Council for the Arts · Technical research and 3D-printed scale model
photography
James Kennedy · Radio-Canada

living memory

Once the sculpture is installed, the voices of those who knew the bridge—workers, commuters and residents—will extend the experience beyond the steel itself.

An on-site QR code will provide access to their interviews.

ready for production

As a winner of the 2023 Champlain Bridge materials reuse competition, the artist was able to acquire the steel needed for Mémoire at a reduced cost. The competition focused on material reuse rather than funding the artwork.

Initiated by the artist, with support from the Canada Council for the Arts for research and the creation of a scale model, the project has completed its main technical preparation stages: steel acquired, transported and cut; fabrication drawings prepared; structural calculations completed; and suppliers identified.

Next steps — installation site · funding · fabrication